Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
- Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495,9 MWe
- Unit 3 is in Mode 7 - outage
- Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 506 MWe
Electricity production since the beginning of the year: 2 374 633 MWh
Ing. Jiří Bezděk
Spokesman of the ČEZ Group