Publication date
Category:JE Dukovany traffic
Information on NPP DUKOVANY 15/10/2026
Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 546 824 946 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 2 - power operation, Reactor power is 100 %, Turbine generator output - 510 MWe
Unit 3 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 4 - power operation, Reactor power is 100 %, Turbine generator output - 514 MWe
Electricity production since the beginning of the year: 11 348 359 MWh.