Skip to Content
Publication date

Information on NPP DUKOVANY 16/10/2026

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 546 873 876 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 - power operation, Reactor power is 100 %, Turbine generator output - 507 MWe
Unit 2 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 3 - power operation, Reactor power is 100 %, Turbine generator output - 509 MWe
Unit 4 - power operation, Reactor power is 100 %, Turbine generator output - 513 MWe

Electricity production since the beginning of the year: 11 397 289 MWh.