Skip to Content

Information on NPP DUKOVANY 16/12/2025

Units 2, 3, 4 are in the operation. The Unit 1 is in the outage for refueling. Electricity production since the beginning of the operation: 534 886 012 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 514 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 513 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 515 MWe

Electricity production since the beginning of the year: 14 090 840  MWh.