8/16/2021
INFORMATION ON NPP DUKOVANY 16/8/2021
Units 1, 2, 3, 4 are operated on power operation. Electricity production since the beginning of the operation: 471 150 000 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 480 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 478 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 482 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Electricity production since the beginning of the year: 8 968 132 MWh.