17. 8. 2021

INFORMATION ON NPP DUKOVANY 17/8/2021

Units 1, 2, 3, 4 are operated on power operation. Electricity production since the beginning of the operation: 471 196 000 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 482 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 488 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495 MWe
 

Electricity production since the beginning of the year: 9 014 111 MWh.