24. 9. 2021

INFORMATION ON NPP DUKOVANY 24/09/2021

Units 1, 2, 3, 4 are operated on power operation. Electricity production since the beginning of the operation: 472 885 837 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 489 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 490 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
 

Electricity production since the beginning of the year: 10 704 344 MWh.