11/9/2022
Information on NPP DUKOVANY 9/11/2022
Units 1, 2, 4 are in the operation. The Unit 3 is in the outage. Electricity production since the beginning of the operation: 489 343 886 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
Unit 3 is in Mode 6 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 504 MWe
Electricity production since the beginning of the year: 12 294 332 MWh.