Skip to Content
Publication date

Information on NPP DUKOVANY 17/04/2026

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 540 095 737 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 504 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 506 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 506 MWe

Electricity production since the beginning of the year: 4 619 150 MWh.