Skip to Content
Publication date

Information on NPP DUKOVANY 18/2/2026

Units 2, 3, 4 are in the operation. The Unit 1 is in a startup mode. Electricity production since the beginning of the operation: 537 255 275 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - startup mode, Reactor power is 89,2 %, Turbine generator output - 456 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 510 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 515 MWe

Electricity production since the beginning of the year: 1 778 689 MWh.