28. 3. 2024

Information on NPP DUKOVANY 28/3/2024

Units 1, 2, 4 are in the operation. Unit 3 is in planned outage. Electricity production since the beginning of the operation: 509 438 239 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493MWe
Unit 3 is in Mode 5 - outage
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe

Electricity production since the beginning of the year: 3 334 140 MWh.