Information on NPP DUKOVANY 29/4/2024

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 510 864 267 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

 

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 490 MWe
Unit 2 is in Mode 1 - stable operation on thermal and power effect, Reactor power is 98,6 %, Turbine generator output - 485 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 501 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe

Electricity production since the beginning of the year: 4 760 168 MWh.