Skip to Content
Publication date

Information on NPP DUKOVANY 19/6/2026

Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 542 385 675 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
Unit 2 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
Unit 3 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
Unit 4 - outage

Electricity production since the beginning of the year: 6 909 089 MWh.