20. 3. 2020

Information on NPP Dukovany 20/3/2020

Units 1, 2, 4 are operated on power operation. Unit 3 is in outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 450 510 422 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

  • Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
  • Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
  • Unit 3 is in Mode 6 - outage
  • Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 504 MWe

 

Electricity production since the beginning of the year: 2 626 774 MWh

Ing. Jiří Bezděk
Spokesman of the ČEZ Group