3. 4. 2020

Information on NPP Dukovany 3/4/2020

Units 1, 2, 4 are operated on power operation. Unit 3 is in outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 451 014 433 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

  • Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 504 MWe
  • Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
  • Unit 3 is in Mode 6 - outage
  • Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 507 MWe

 

Electricity production since the beginning of the year: 3 130 785 MWh

Ing. Jiří Bezděk
Spokesman of the ČEZ Group