Skip to Content
Publication date

Information on NPP DUKOVANY 12/3/2026

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 538 335 202 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 516 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 512 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 507 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 514 MWe

Electricity production since the beginning of the year: 2 858 616 MWh.