30. 10. 2020

Information on NPP Dukovany 30/10/2020

Units 1, 3 and 4 are operated on power operation. Unit 2 is in planned outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 460 093 608 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 501 MWe
Unit 2 is in Mode 6 - outage
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
 

Electricity production since the beginning of the year: 12 208 731 MWh.