18. 11. 2020

Information on NPP Dukovany 18/11/2020

Units 3 and 4 are operated on power operation. Units 1 and 2 are in planned outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 460 713 328 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 4 - outage
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 481 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
 

Electricity production since the beginning of the year: 12 828 452 MWh.