30. 12. 2020

Information on NPP Dukovany 30/12/2020

Units 2, 3 and 4 are operated on power operation. Unit 1 is in planned outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 462 110 069 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
 

Electricity production since the beginning of the year: 14 225 192 MWh.