1/7/2021
Information on NPP Dukovany 7/1/2021
Units 2, 3 and 4 are operated on power operation. Unit 1 is in planned outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 462 395 151 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 491 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Electricity production since the beginning of the year: 213 657 MWh.