28. 1. 2021

Information on NPP Dukovany 28/1/2021

Units 2, 3 and 4 are operated on power operation. Unit 1 is in outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 463 148 554 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 497 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
 

Electricity production since the beginning of the year: 967 060 MWh.