1. 3. 2021

Information on NPP Dukovany 1/3/2021

Units 1, 2, 3 are operated on power operation. Unit 4 is in outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 464 287 286 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 497 MWe
Unit 4 is in Mode 7 - outage
 

Electricity production since the beginning of the year: 2 105 793 MWh.