3/31/2021
Information on NPP Dukovany 31/3/2021
Units 1, 2, 3 are operated on power operation. Unit 4 is in outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 465 356 106 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 482 MWe
Unit 4 is in Mode 6 - outage
Electricity production since the beginning of the year: 3 174 613 MWh.