7. 4. 2021

Information on NPP Dukovany 7/4/2021

Units 1, 2, 3 are operated on power operation. The Unit 4 is in a startup mode after refuelling. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 465 604 277 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 505 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 4 is in Mode 1 - startup mode after refuelling, Reactor power is 20 %, Turbine generator output - 0 MWe
 

Electricity production since the beginning of the year: 3 422 783 MWh.