9. 4. 2021

Information on NPP Dukovany 9/4/2021

Units 1, 2, 3 are operated on power operation. The Unit 4 is in a startup mode after refuelling. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 465 679 851 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 503 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 501 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 4 is in Mode 1 - startup mode after refuelling, Reactor power is 73 %, Turbine generator output - 340 MWe
 

Electricity production since the beginning of the year: 3 498 358 MWh.