14. 7. 2021

Information on NPP Dukovany 14/7/2021

Units 1, 2, 3, 4 are operated on power operation. Electricity production since the beginning of the operation: 469 638 434 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 480 MWe 
Unit 3 is in Mode 1 - power operation, Reactor power is 50 %, Turbine generator output - 237 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 488 MWe
 

Electricity production since the beginning of the year: 7 456 940 MWh.