17. 6. 2020

Information on NPP Dukovany 17/6/2020

Units 1, 2, 3, 4 are operated on power operation. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 454 225 535 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 488 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 485 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 485 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 490 MWe
 

Electricity production since the beginning of the year: 6 340 658 MWh