4. 8. 2020

Information on NPP Dukovany 4/8/2020

Units 1, 2, 3, 4 are operated on power operation. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 456 448 824 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 485 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 479 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe
 

Electricity production since the beginning of the year: 8 563 948 MWh