04/06/2020
INFORMATION ON NPP TEMELÍN 108 / 2020
The Unit 1 and Unit 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1073 MWe
- Electricity production since the beginning of the year: 2 270 319 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1081 MWe
- Electricity production since the beginning of the year: 4 047 161 MWh
News on the topic