1. 7. 2020

INFORMATION ON NPP TEMELÍN 127 / 2020

Unit 1 is in the operation. Unit 2 is in the planned outage for refuelling. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1073 MWe
  • Electricity production since the beginning of the year: 2 967 863 MWh

 

Information on parameters at Unit 2:

  • Unit is in the planned outage
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 4 272 380 MWh