INFORMATION ON NPP TEMELÍN 135 / 2012
The Unit 2 is in operation at full rated power. The Unit 1 is operated in the mode of power effect of reactivity. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1 today on July 16, 2012 at 9:15 o‘clock:
- Unit is in Mode 1 - power operation
- Reactor power is 100 %
- Turbine generator output - 1016 MWe
- Electricity production since the beginning of the year: 4 736 876 MWh
Information on parameters at Unit 2 today on July 16, 2012 at 9:15 o‘clock:
- Unit is in Mode 1 - power operation
- Reactor power is 100 %
- Turbine generator output - 1015 MWe
- Electricity production since the beginning of the year: 3 619 793 MWh