10. 8. 2021

INFORMATION ON NPP TEMELÍN 153 / 2021

Unit 1 is in the operation. Unit 2 is in the outage for refueling. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1073 MWe
  • Electricity production since the beginning of the year: 4 234 666 MWh

 

Information on parameters at Unit 2:

  • Unit is in the outage
  • Turbine generator output – 0 MWe
  • Electricity production since the beginning of the year: 4 559 780 MWh