6. 8. 2025

INFORMATION ON NPP TEMELÍN 151 / 2025

Both Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • The power of the reactor – 98 %
  • Electricity production since the beginning of the year: 4 217 955 MWh

 

Information on parameters at Unit 2:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 5 460 962 MWh