20. 8. 2020

INFORMATION ON NPP TEMELÍN 162 / 2020

Both Unit 1 and 2 are in operation at planned power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output – 1075 MWe
  • Electricity production since the beginning of the year: 4 256 473 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1086 MWe
  • Electricity production since the beginning of the year: 4 525 581 MWh