27/08/2020
INFORMATION ON NPP TEMELÍN 167 / 2020
The Unit 1 and Unit 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1074 MWe
- Electricity production since the beginning of the year: 4 436 185 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1094 MWe
- Electricity production since the beginning of the year: 4 707 735 MWh
News on the topic