9/21/2021
INFORMATION ON NPP TEMELÍN 183 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1088 MWe
- Electricity production since the beginning of the year: 5 326 076 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1096 MWe
- Electricity production since the beginning of the year: 5 163 142 MWh
News on the topic
ČEZ plans to go after hackers. It puts tens of millions into increasing its cyber security every year
Westinghouse to Upgrade Temelín's Control and Monitoring Systems
Unit 2 of Temelín produces electricity again
The country’s largest parking complex with a photovoltaic power plant built at the Dukovany Nuclear Power Plant