Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1093 MWe
- Electricity production since the beginning of the year: 5 557 590 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1100 MWe
Electricity production since the beginning of the year: 5 398 910 MWh