8. 10. 2021

INFORMATION ON NPP TEMELÍN 195 / 2021

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1091 MWe
  • Electricity production since the beginning of the year: 5 767 009 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1095 MWe
  • Electricity production since the beginning of the year: 5 608 922 MWh