13/10/2021
INFORMATION ON NPP TEMELÍN 198 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1093 MWe
- Electricity production since the beginning of the year: 5 898 416 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1099 MWe
- Electricity production since the beginning of the year: 5 740 854 MWh
News on the topic
- ČEZ plans to go after hackers. It puts tens of millions into increasing its cyber security every year
- Westinghouse to Upgrade Temelín's Control and Monitoring Systems
- Unit 2 of Temelín produces electricity again
- The country’s largest parking complex with a photovoltaic power plant built at the Dukovany Nuclear Power Plant