11/11/2020
INFORMATION ON NPP TEMELÍN 219 / 2020
The Unit 1 a 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1090 MWe
- Electricity production since the beginning of the year: 6 361 521 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1102 MWe
- Electricity production since the beginning of the year: 6 704 034 MWh