19. 11. 2020

INFORMATION ON NPP TEMELÍN 224 / 2020

The Unit 1 a 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1080 MWe
  • Electricity production since the beginning of the year: 6 570 048 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1093 MWe
  • Electricity production since the beginning of the year: 6 915 299 MWh