7. 12. 2020

INFORMATION ON NPP TEMELÍN 236 / 2020

The Unit 1 a 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1087 MWe
  • Electricity production since the beginning of the year: 7 040 158 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1098 MWe
  • Electricity production since the beginning of the year: 7 391 223 MWh