10/02/2021
INFORMATION ON NPP TEMELÍN 28 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1085 MWe
- Electricity production since the beginning of the year: 1 044 196 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1104 MWe
- Electricity production since the beginning of the year: 1 058 717 MWh
News on the topic