Skip to Content
Publication date

INFORMATION ON NPP TEMELÍN 34 / 2026

Unit 1 is in the operation. Unit 2 is in the planned outage for refuelling. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 1 288 365 MWh

Information on parameters at Unit 2:

  • The power of the reactor – 0 %
  • Electricity production since the beginning of the year: 1 112 610 MWh