25/03/2021
INFORMATION ON NPP TEMELÍN 59 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1080 MWe
- Electricity production since the beginning of the year: 2 166 547 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1104 MWe
- Electricity production since the beginning of the year: 2 196 266 MWh