INFORMATION ON NPP TEMELÍN 97 / 2020
The Unit 1 and Unit 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1047 MWe
- Electricity production since the beginning of the year: 1 888 859 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1082 MWe
- Electricity production since the beginning of the year: 3 661 761 MWh