22. 5. 2020

INFORMATION ON NPP TEMELÍN 99 / 2020

The Unit 1 and Unit 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1083 MWe
  • Electricity production since the beginning of the year: 1 940 107 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1084 MWe
  • Electricity production since the beginning of the year: 3 713 866 MWh