03/11/2025
Information on NPP DUKOVANY 3/11/2025
Units 1, 3, 4 are in the operation. The Unit 2 is in the startup mode. Electricity production since the beginning of the operation: 532 853 176 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 506 MWe
Unit 2 is in Mode 1 - startup mode
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 507 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 512 MWe
Electricity production since the beginning of the year: 12 057 997 MWh.