The Unit 1 is in operation at full rated power. According to the plan Unit 2 operates in the power effect of reactivity mode. During this period, the reactor power will be slowly decreased till about 90 % RTP. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in operation
- Turbine generator output – 1084 MWe
- Electricity production since the beginning of the year: 2 886 931 MWh
Information on parameters at Unit 2:
- Unit is in operation
- Turbine generator output - 999 MWe
- Electricity production since the beginning of the year: 4 480 375 MWh
Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín