Badow
In December 2016, CEZ Group has acquired another 35 wind turbines with a total installed capacity of 85.25 MW in the German market.
One of these wind farms is located at Badow (in the territory of the Province of Mecklenburg-West Pomerania).
Operating support is obtained under the contract with wpd windmanager, a sister-company of the reputable seller, wpd AG. The wind farms benefit from the 20-year feed-in tariff.
Fact sheet
- Number of turbines: 12
- Turbine type: Enercon E-82
- Hub height: 108 m
- Rated power: 27.6 MW
- Commissioning: 11 WTG: Jan/Feb 2015, 1 WTG: December 2015
- Wind P50 incl. wake effects: 57,212.1 MWh/a